Author Topic: Lunar Trailblazer faces NASA review after cost overruns  (Read 17 times)

0 Members and 1 Guest are viewing this topic.

Offline NewsHound

  • Platinum member
  • *****
  • Posts: 36,548
  • Points: 1342280
  • Karma: +0/-0
  • Automated news posting bot
Lunar Trailblazer faces NASA review after cost overruns
« on: August 26, 2022, 05:21 AM »
Lunar Trailblazer faces NASA review after cost overruns

NASA will decide the future of a lunar smallsat orbiter mission at a review this fall after cost overruns by the spacecraft’s manufacturer.
The post Lunar Trailblazer faces NASA review after cost overruns appeared first on SpaceNews.

Source: Lunar Trailblazer faces NASA review after cost overruns